deathnestonline | Verified

The Rehman Baba Express derailed near Sher Shah Railway Station in the Multan district of Punjab, Pakistan, on the morning of October 13, 2026, killing passengers and injuring dozens of others. The train was travelling from Karachi to Peshawar when several coaches left the tracks, disrupting rail services and triggering a major rescue operation.

Initial reports confirmed at least five deaths, while later coverage published a higher toll. The reported casualty figures have differed between news outlets, so the final confirmed number should be checked against the latest statements from railway and rescue authorities. Investigators have also begun examining a suspected mechanical fault involving one of the passenger coaches. <Cite refs={[“turn727017search0″,”turn727017search8”]}/>

Rehman Baba Express Accident: Key Details

Detail Information
Train Rehman Baba Express, 47-Up
Date of accident October 13, 2026
Approximate time Around 5:15 a.m. local time
Route Karachi to Peshawar
Accident location Near Sher Shah Railway Station, Multan district, Punjab, Pakistan
Type of incident Train derailment
Fatalities Multiple deaths reported; published totals differ
Injuries Dozens of passengers injured
Hospital treating injured passengers Nishtar Hospital, Multan
Investigating authority Pakistan Railways and the Federal Government Inspector of Railways
Preliminary cause A component beneath a passenger coach reportedly became lodged at a railway crossing
Final investigation outcome Not established in the reports reviewed

What Happened to the Rehman Baba Express?

The passenger train was travelling towards Peshawar in the early hours of Tuesday, October 13, when the derailment occurred near Sher Shah Railway Station outside Multan.

Rescue officials reported that multiple coaches came off the tracks, with some overturning. Passengers were left stranded as emergency workers, police and other responding teams began helping people from the damaged train and transporting injured passengers for medical care.

The incident affected both railway lines in the area, disrupting services and requiring authorities to arrange alternative transport for passengers whose journeys had been interrupted. A replacement train was organised to carry passengers onwards, while buses were arranged for people who wished to continue their journeys by road. <Cite refs={[“turn727017search1″,”turn727017search4”]}/>

Death Toll and Injured Passengers

The derailment resulted in multiple fatalities and injuries. Early reporting from Dawn confirmed five deaths and more than 40 injured passengers. A later report by the Express Tribune cited rescue sources who reported seven deaths and more than 50 people injured. Because these figures differ, they should not be treated as a single settled final toll without further official confirmation. <Cite refs={[“turn727017search1″,”turn727017search8”]}/>

Injured passengers were taken to Nishtar Hospital in Multan for treatment. Authorities and medical staff worked to provide care as the rescue response continued.

The identities of all those who died, along with individual medical conditions and family notifications, should be confirmed through official announcements. Details about funeral arrangements were not established in the reports reviewed.

Preliminary Investigation Points to a Coach Component

An initial railway investigation report described a component hanging beneath the passenger coach immediately behind the locomotive. According to the report, the component became caught in the nose of a railway crossing, contributing to the derailment.

The initial findings identified the affected coach as number 12430-6. The report indicated that the problem began at the crossing and led to further coaches leaving the tracks. The engine and luggage van reportedly passed through the crossing before the derailment developed. <Cite refs={[“turn727017search2″,”turn727017search7”]}/>

These findings are preliminary. A full investigation is needed to establish the sequence of mechanical failure, determine whether maintenance or inspection issues played a role, and identify any further contributing factors.

Some passengers also made claims about repairs to the nuts and bolts of another coach before the accident. Those accounts had not been independently verified in the reporting reviewed, and no established link between those alleged repairs and the derailment was confirmed. <Cite refs={[“turn727017search4″,”turn727017search8”]}/>

Government Orders Inquiry Into the Train Crash

Pakistan’s railway authorities launched an investigation following the derailment. The federal minister for railways directed the Federal Government Inspector of Railways to examine the incident and establish how the coaches came off the tracks.

The government also directed officials to ensure that injured passengers received medical care and said compensation would be provided to affected families in accordance with Pakistan Railways’ insurance arrangements.

President Asif Ali Zardari and Prime Minister Shehbaz Sharif expressed grief over the deaths and called for action following the incident. The investigation is expected to clarify the technical circumstances and determine whether further measures are needed to prevent similar accidents. <Cite refs={[“turn727017search0″,”turn727017search5”]}/>

Train Services Disrupted Near Multan

The derailment blocked railway tracks and disrupted services passing through the Multan area. Authorities diverted some trains through the Lodhran, Jahanian and Khanewal route while work continued to clear the affected section.

A replacement train was arranged for Rehman Baba Express passengers, and road transport was provided for those who preferred not to wait for onward rail travel. Railway operations through the alternative route were reported to have resumed, although clearing the damaged coaches and restoring the affected tracks remained part of the response. <Cite refs={[“turn727017search0″,”turn727017search8”]}/>

Passengers travelling through the region should consult Pakistan Railways for the latest service information before beginning or continuing their journeys.

A Difficult Day for Passengers and Their Families

For those aboard the Rehman Baba Express, the derailment turned an ordinary journey into an emergency. Families waiting for relatives and passengers trying to reach their destinations faced uncertainty as rescue workers searched the damaged coaches and hospitals treated the injured.

The deaths have brought grief to the affected families, while those who survived the accident have had to cope with injuries and the shock of the incident. As more information becomes available, accurate reporting remains important so that families receive reliable updates and unverified claims do not become confused with established facts.

Latest Update on the Rehman Baba Express Accident

The latest reports reviewed describe a preliminary investigation pointing to a component beneath a passenger coach becoming lodged at a railway crossing. However, casualty figures reported by different outlets have varied, and the final confirmed death toll should be checked against updated official information.

The Federal Government Inspector of Railways has been tasked with investigating the incident. The cause should be described as preliminary until the inquiry establishes the full sequence of events and releases its findings.

Disclaimer

This article summarises published reporting about the October 13, 2026, derailment of the Rehman Baba Express near Multan, Pakistan. Casualty figures differ across reports and may change as authorities provide updates. The mechanical explanation is based on preliminary investigation findings and should not be treated as the final determination of responsibility. Readers should consult Pakistan Railways, local rescue authorities and reputable news outlets for confirmed updates.

By Admin

Leave a Reply

Your email address will not be published. Required fields are marked *

You missed